Burnside Bridge Replacement

Downstream Elevation

Downstream Elevation

Background

Burnside Bridge was in very poor condition.

There were stones missing from the masonry arch, open joints, and a build up of silt due to an existing wier.

 

Completed Works

The existing weak masonry arch was replaced between April and July 2017.

The project was designed by Fife Council and works carried out by Realm Construction Ltd.

 